1. Cedar Hollow P.S
- New school + addition, 2015/16
2. Education Centre
- New sideway on East side, 2015/16
- Replace Parking Lot Asphalt, Curbs and Sidewalks, 2018/19
3. Ashley Oaks P.S.
- Replace exterior stairs, 2016/17
- Replacement of asphalt path on southeast side of property, 2021/22
4. Emily Carr P.S.
- Replace entrance sideways, 2016/17
5. Eagle Heights
- New asphalt walkway west from school, 2016/17
6. Wilfrid Laurier P.S.
- Replace front sidewalk and stairs, 2016/17
7. Westminster S.S.
- Replace various sidewalks and exterior stairs, 2016/17
- Replace parking lot asphalt, storm lines, and sidewalks as needed, 2017/18
8. Summerside P.S.
9. Arthur Stringer P.S.
- Replace east portion of parking lot, islands, sidewalks, and fencing, 2018/19
10. Hickson Central P.S.
- Supply and Install New 1.5m X 33m New Sidewalk Along main Drop Off, 2018/19
- Phase 1 Pave West Gravel Parking Lot, Replace Sidewalks and 1/2 Playground Asphalt. Upgrade Storm, 2019/20
11. Westmount P.S.
- Replace Roadway and Parking Lot Asphalt, Sidewalks, Curbs, Upgrade Storm, 2018/19
12. Lucas S.S.
- Replace front sidewalk, 2018/19
13. Delaware Central P.S.
- Phase 1 Replace Drop Off, Parking Areas, Playground, Sidewalks and Some Fencing. Upgrade Storm System, 2019/20
14. Ekcoe Central P.S.
- Replace Parking Lot and 1/2 of Playground Asphalt, Sidewalks, Some Fencing and Upgrade Storm, 2019/20
15. Mosa Central P.S.
- Replace Drop Off, Parking Lot and Sidewalks. Upgrade Storm, 2019/20
16. Riverside P.S.
- Phase 1 Replace Asphalt Walkways and Playground Asphalt. Upgrade Storm, 2019/20
17. Huron Park S.S.
- Phase 2 Replace Sanitary From Small Gym and Water Service. Replace Drop Off Asphalt and Sidewalks, 2019/20
18. Wheable Centre
- Phase 2 Replace Storm and Sanitary as Require, Roadways, Parking, Sidewalks and Curbs, 2021
19. Northdale P.S.
- Phase 2 Provide New Parking Area, Sidewalk, Playground Asphalt
20. North Middlesex District S.S.
- Replace entrance landings & sidewalks for barrier free path of travel, 2021/22
21. Oliver Stephens P.S.
- Addition of sidewalk, 2021/22
22. South Ridge P.S.
- Provide landing and sidewalk for barrier free path of travel, 2021/22
- Provide sidewalk to Kindergarten Entrance and fence, 2022/23
23. Belmont P.S.
24. Turtle Island P.S.
25. Northwest P.S.
26. White Pine P.S.
27. Masonville P.S.
- Drainage Improvements - Sidewalk Replacement - Phase 1, 2022/23
28. Cleardale P.S.
- Provide sidewalk and power door operator at Kindergarten Door, 2022/23
29. New Lucan P.S.
30. New SE London P.S.
31. Chippewa P.S.
- Install a new bike/walking path on property that joins into a new path for a playground on City property, 2023/24
32. New SW London P.S.
33. Kettle Creek P.S.
- Add Asphalt sidewalks on the southside school and added catch basin on a low spot on the asphalt play yard, 2024/25
34. Westmount P.S.
- Kindergarten Classroom Elevated Sidewalk, 2024/25
35. Saunders S.S.
- Provide paved sidewalk to athletic track, 2024/25
|